Digital Staff Deep Audit and Remediation Plan

Digital Staff Deep Audit and Remediation Plan

Sister Document: Digital Staff Troubleshooting Checklist — Comprehensive Item-by-Item Verification and Demo Orchestration Suggestions; This document focuses on audit findings and remediation priorities.

Audit Date: 2026-08-24

Audit Method: Automated YAML Definition Scanning + Real Worker File Logic Analysis + Scheduling/Collaboration Configuration Review

Audit Script: audit-staff.js

1. Audit Results Overview

DimensionPass CountPercentageDescription
Compliant (Definition Complete)77100%id/name/title/description/worker/enabled/capabilities/item_types/keywords/kpi all present
Can Complete Full Process (Worker Has Real Logic)3748%Worker file exists + has execute function + has return + has real dependencies + >30 lines
Evolvable/Repairable (Has Scheduling + Real Logic)1621%Has cron/loop/goal configuration + worker has real execution logic
Collaborative (Has Collaboration Configuration)1418%onComplete/onTrigger/peers configured in YAML
All four passed (truly usable)45%DS-BIZ-001 / DS-STOCK-001 / DS-ECR-001 / DS-STAT-001

II. Problem Classification and Quantity

Problem 1: Worker file does not exist (17 instances)

The YAML defines a worker name, but the file does not exist at all, causing a MODULE_NOT_FOUND error when called.

| Employee ID | Worker Name | YAML Description | Severity |

|--------|----------|----------|--------|

| DS-PRODUCT-001 | product | Product Assistant | P0 |

| DS-MALL-001 | mall | Mall Assistant | P1 |

| DS-SCSAI-001 | (empty) | Universal Object Creation Engineer | P0 |

| DS-KBPIPE-001 | kb-pipeline | Industry Knowledge Base Pipeline Operator | P2 |

| DS-DOC-001 | doc | Document Validator | P1 |

| DS-LOOP-001 | auto-loop | Autonomous Loop Operator | P1 |

| DS-CS-001 | customer-service | Customer Service Digital Employee | P2 |

| DS-QCC-001 | qcc | Quality Control Coordinator | P0 |

| DS-CAPA-001 | capa | Corrective Action Coordinator | P0 |

| DS-NCR-001 | ncr | Nonconforming Product Handler | P0 |

| DS-FMEA-001 | fmea | FMEA Analyst | P1 |

| DS-AUDIT-001 | audit | System Auditor | P1 |

| DS-SPC-001 | spc | Statistical Process Controller | P1 |

| DS-SCCAPP-DESIGN-001 | sccapp-design | Process Designer | P1 |

| DS-SCCAPP-OPT-001 | sccapp-optimize | Process Optimizer | P1 |

| DS-SCCAPP-SYNC-001 | sccapp-sync | Process Synchronizer | P1 |

| DS-SCCAPP-QBRIDGE-001 | sccapp-quality-bridge | Process-Quality Bridge Operator | P1 |

Issue 2: Worker is a 41-line empty skeleton (19 instances)

File exists but contains only 41 lines of template code, 9 TODOs, no real dependencies, success: false, implemented: 'skeleton'.

| Employee ID | Worker Name | YAML Description | Business Domain |

|--------|----------|----------|----------|

| DS-ASSET-001 | asset | Asset Manager | Fixed Assets |

| DS-BOM-001 | bom | BOM Manager | Core Business |

| DS-COMP-001 | compliance | Compliance Reviewer | Compliance |

| DS-CONTRACT-001 | contract | Contract Reviewer | Contract |

| DS-ENERGY-001 | energy | Energy Manager | Energy |

| DS-FIN-001 | finance | Financial Analyst | Finance |

| DS-HR-001 | hr | HR Manager | Human Resources |

| DS-INVOICE-001 | invoice | Invoice Processor | Finance |

| DS-LOG-001 | logistics | Logistics Tracker | Logistics |

| DS-MEET-001 | meeting | Meeting Assistant | Administration |

| DS-PROC-PLAN-001 | proc-plan | Procurement Planner | Procurement |

| DS-PROD-001 | production | Production Scheduler | Core Business |

| DS-QUALITY-001 | quality | Quality Inspector | Core Business |

| DS-RISK-001 | risk | Risk Assessor | Risk |

| DS-SAFETY-001 | safety | Safety Inspector | Safety |

| DS-SUP-AUDIT-001 | sup-audit | Supplier Auditor | Procurement |

| DS-TRAIN-001 | training | Training Manager | Human Resources |

| DS-TRAVEL-001 | travel | Travel Manager | Administration |

| DS-WH-001 | warehouse | Warehouse Manager | Core Business |

Issue 3: No scheduling configuration — cannot run autonomously (49)

No cron/loop/goal configuration; can only be triggered manually via runStaffOnce and will not execute any tasks automatically.

Issue 4: No collaboration configuration — isolated employees (63)

No collaboration configuration; cannot collaborate with other employees or participate in business closed loops.

Issue 5: Workers have TODO/FIXME tags (21)

  • 19 skeleton workers: each has 9-10 TODOs
  • DS-STOCK-001: 6 TODOs
  • DS-KNOWLEDGE-001: 2 TODOs

III. Fix Plan (Sorted by ROI)

P0: Core business closed loop (Expected to pass all four items after fix: 4→15)

#### P0-1: Add 4 missing core workers (files do not exist)

| No. | Employee | worker | Required Tasks | Reference Template | Estimated Lines |

|------|------|--------|----------|----------|----------|

| 1 | DS-PRODUCT-001 | product.js | Product CRUD + query SCSAI Product | procurement.js | ~300 lines |

| 2 | DS-SCSAI-001 | SCSAI-creator.js (existing) | Correct the worker field in YAML to an existing worker name | — | Modify YAML |

| 3 | DS-QCC-001 | qcc-worker.js | Quality Control Coordination: Query QCC data + Judgment + Trigger correction | ecr-worker.js | ~250 lines |

| 4 | DS-CAPA-001 | capa-worker.js | Corrective Action Management: Create CAPA + Track + Verify closure | ecr-worker.js | ~250 lines |

| 5 | DS-NCR-001 | ncr-worker.js | Nonconforming Product Handling: Create NCR + Isolation + Disposition decision | ecr-worker.js | ~250 lines |

#### P0-2: Populate 4 core shell workers (41 lines → real logic)

| No. | Staff | worker | Tasks | Reference Template | Estimated Lines |

|------|------|--------|----------|----------|----------|

| 6 | DS-BOM-001 | bom.js | BOM query + validation + Where-Used | ecr-worker.js + SCSAI-client | ~300 lines |

| 7 | DS-PROD-001 | production.js | Production Order Query + Scheduling + Status Update | ecr-worker.js | ~280 lines |

| 8 | DS-QUALITY-001 | quality.js | Quality Inspection Record + Judgment + Trigger NCR | ecr-worker.js | ~280 lines |

| 9 | DS-WH-001 | warehouse.js | Inventory Query + Inbound/Outbound + Alert | stock-manager.js | ~300 lines |

#### P0-3: Add Scheduling + Collaboration Configuration for Core Employees

  • Add cron configuration for the above 9 employees (for periodic inspection/synchronization)
  • Add collaboration.onComplete configuration for the above 9 employees (to connect business closed loops)
  • For example: DS-QUALITY-001 detects non-conformance → Triggers DS-NCR-001 to create an NCR → Triggers DS-CAPA-001 to create a corrective action

P1: Quality Management + Process Closed Loop (Estimated to pass all four items after fixes: 15→25)

#### P1-1: Complete 6 missing quality/process workers

| No. | Employee | worker | Tasks Required |

|------|------|--------|----------|

| 10 | DS-FMEA-001 | fmea-worker.js | FMEA Analysis: Failure Mode + Risk Priority Number + Recommendations |

| 11 | DS-SPC-001 | spc-worker.js | SPC Control: Process Data + Control Chart + Anomaly Detection |

| 12 | DS-AUDIT-001 | audit-worker.js | System Audit: Audit Plan + Checklist + Nonconformities |

| 13 | DS-SCCAPP-DESIGN-001 | sccapp-design-worker.js | Process Design: Operation + Step + Parameters |

| 14 | DS-SCCAPP-OPT-001 | sccapp-optimize-worker.js | Process Optimization: Parameter Optimization + Efficiency Analysis |

| 15 | DS-SCCAPP-SYNC-001 | sccapp-sync-worker.js | Process Synchronization: SCSAI ↔ SCCAPP Data Sync |

#### P1-2: Complete 3 Missing Document/Customer Service Workers

| No. | Employee | worker | To Do |

|------|------|--------|----------|

| 16 | DS-DOC-001 | doc-worker.js (existing) | Correct the YAML worker field to doc-worker |

| 17 | DS-LOOP-001 | auto-loop-worker.js (existing) | Correct the YAML worker field to auto-loop-worker |

| 18 | DS-CS-001 | customer-service-worker.js (existing) | Correct the YAML worker field to customer-service-worker |

P2: Functional Department Employees (Expected to pass all four items after fix: 25→40)

#### P2-1: Populate 15 Functional Shell Workers

The business logic for these workers is relatively simple (mainly CRUD + query + reporting) and can be batch-generated using a unified template:

| No. | Employee | worker | Core Logic |

|------|------|--------|----------|

| 19 | DS-PROC-PLAN-001 | proc-plan.js | Procurement Plan: Demand Aggregation + Supplier Matching + Plan Generation |

| 20 | DS-SUP-AUDIT-001 | sup-audit.js | Supplier Audit: Audit Plan + Scoring + Rectification Tracking |

| 21 | DS-FIN-001 | finance.js | Financial Analysis: Cost Statistics + Budget Comparison + Alerts |

| 22 | DS-INVOICE-001 | invoice.js | Invoice Processing: Invoice Recognition + Validation + Posting |

| 23 | DS-HR-001 | hr.js | HR Management: Personnel Information + Attendance + Performance |

| 24 | DS-TRAIN-001 | training.js | Training Management: Training Plan + Records + Certificate Tracking |

| 25 | DS-CONTRACT-001 | contract.js | Contract Review: Contract Entry + Clause Review + Expiration Alert |

| 26 | DS-COMP-001 | compliance.js | Compliance Review: Compliance Check + Violation Records + Rectification |

| 27 | DS-RISK-001 | risk.js | Risk Assessment: Risk Identification + Evaluation + Response Measures |

| 28 | DS-SAFETY-001 | safety.js | Safety Inspection: Safety Patrol + Hidden Hazards + Rectification |

| 29 | DS-ENERGY-001 | energy.js | Energy Management: Energy Consumption Statistics + Analysis + Energy-saving Suggestions |

| 30 | DS-LOG-001 | logistics.js | Logistics Tracking: Logistics Status + Timeliness + Exceptions |

| 31 | DS-MEET-001 | meeting.js | Meeting Assistant: Meeting Scheduling + Minutes + To-do Tracking |

| 32 | DS-TRAVEL-001 | travel.js | Travel Management: Travel Application + Approval + Reimbursement |

| 33 | DS-ASSET-001 | asset.js | Asset Management: Ledger + Depreciation + Inventory |

P3: Foundational Capabilities + Collaboration Chain (Expected to pass all four items after fixes, 40→55)

#### P3-1: Fix 4 foundational capability workers (no real dependencies)

| No. | Employee | worker | Issue |

|------|------|--------|------|

| 34 | DS-IDENTIFY-001 | identify.js | 97 lines but no real dependencies, needs to connect to SCSAI query |

| 35 | DS-REPAIR-001 | repair.js | 87 lines but no real dependencies, needs to connect to data repair logic |

| 36 | DS-COMPARE-001 | compare.js | 98 lines but no real dependencies, needs to connect to data comparison |

| 37 | DS-PROCESS-OPT-001 | process-optimizer.js | 91 lines but no real dependencies, needs to connect to process optimization |

#### P3-2: Add cron configuration for 49 unscheduled employees

Add cron expressions for scheduled inspection/synchronization/report generation based on business requirements.

#### P3-3: Add collaboration configuration for 63 non-collaborative employees

Connect according to business closed loops:

  • Procurement closed loop: PROC→VEN→COST→ECR
  • Quality closed loop: QUALITY→NCR→CAPA→FMEA
  • Process closed loop: SCCAPP-DESIGN→SCCAPP-OPT→SCCAPP-SYNC
  • Production closed loop: PROD→QUALITY→LOG→WH

P4: Industry extension + edge employees (expected to pass all four items after repair: 55→70+)

#### P4-1: Complete Remaining Missing Workers

| No. | Employee | worker |

|------|------|--------|

| 34 | DS-MALL-001 | mall-worker.js (existing) → YAML correction |

| 35 | DS-KBPIPE-001 | kb-pipeline-worker.js (existing) → YAML correction |

| 36 | DS-SCCAPP-QBRIDGE-001 | sccapp-quality-bridge-worker.js (existing) → YAML correction |

IV. Fix Strategies

Strategy 1: YAML Worker Name Correction (Zero Code, Fastest Impact)

The worker files for these 6 employees already exist, but the names in YAML are incorrect:

  • DS-SCSAI-001: worker is empty → change to SCSAI-creator
  • DS-DOC-001: doc → doc-worker
  • DS-LOOP-001: auto-loop → auto-loop-worker
  • DS-CS-001: customer-service → customer-service-worker
  • DS-MALL-001: mall → mall-worker
  • DS-KBPIPE-001: kb-pipeline → kb-pipeline-worker
  • DS-SCCAPP-QBRIDGE-001: sccapp-quality-bridge → sccapp-quality-bridge-worker

Strategy 2: Populating Shell Workers (Medium Code Volume, High ROI)

19 shell workers can be populated using a unified template:

  1. require SCSAI-client to query real data
  2. require sqlite-compat to read/write local DB
  3. Implement CRUD + Query + Report Generation
  4. Integrate staffLog to record execution logs
  5. Return structured results

Strategy 3: Creating Missing Workers from Scratch (High Code Volume, Prioritized by Business Needs)

11 genuinely missing workers need to be built from the ground up, completed step by step according to P0→P1→P2 priorities.

Strategy 4: Batch Adding Scheduling + Collaboration Configuration (Low Code Volume, High Coverage)

  • cron configuration: Add scheduled expressions based on business requirements
  • collaboration configuration: Chain onComplete according to business closed loops

V. Expected Outcomes

PhaseFix ContentCount of All Four Tests PassedPercentage
Current—45%
P0 CompletedCore Business Closed Loop~1519%
P1 CompletedQuality Management Closed Loop~2532%
P2 CompletedFunctional Departments~4052%
P3 CompletedFoundational Capabilities + Collaboration~5571%
P4 CompletedIndustry Expansion~70+90%+

VI. Risks and Considerations

  1. YAML is the Sole Source of Truth: All modifications must be made in YAML and take effect upon restart; do not manually edit the database.
  2. The "Honesty" Principle for Skeleton Workers: The current skeleton returns success: false; change to success: true after implementing the real logic.
  3. SCSAI Connection Dependency: Some workers depend on the SCSAI server (ylxt.chat) and will degrade if the network is unavailable.
  4. BOSS_SCHEDULER_CRON=off: Cron jobs are currently disabled in this environment. Change to 'on' after adding cron configurations to enable automatic execution.
  5. Collaboration Workflow Testing: After adding collaboration configurations, perform end-to-end testing to ensure onComplete triggers correctly.
← 返回案例列表

Try 左帮右臂 Industrial Agent — your digital workforce

Available as a WeChat mini program, web app (ylxt.chat) and desktop client. Start from whichever fits your workflow.

🌐 Web App 💻 Desktop Download 📞 Call 189-8606-6876
WeChat mini program QR
Scan for the WeChat mini program
Share:
🤖 Try Now →
🤖
🎁